How Long Does Hardwood Floor Refinishing Take?
A typical hardwood floor refinishing project takes around 3–4 days, although some projects may take less time and others may require longer. Refinishing is not simply a matter of sanding the floor and applying a new coat of finish. There are several stages involved, including preparation, sanding, staining when requested, finishing, drying, cleanup, and a final walkthrough.
A general timeline may look like this:
- Before Day 1: In-home assessment, quote, stain selection, finish selection, and preparation
- Day 1: Preparing the work area and beginning the sanding process
- Day 2: Completing sanding and applying stain if a colour change is requested
- Day 3: Applying the protective finish
- Day 4: Final finishing, drying, cleanup, and walkthrough
This is only a general example. A smaller or simpler project may move more quickly, while a larger floor or one requiring additional preparation may take longer. That’s why it’s best to treat the 3–4 day estimate as a planning range rather than a guarantee that every project will follow exactly the same schedule.
What Happens Before the Refinishing Project Begins?
The refinishing timeline actually starts before the sanding equipment arrives. Before work begins, the flooring needs to be assessed so the contractor can understand its condition and determine what needs to be done to achieve the desired result. This is also when homeowners can discuss the appearance they want for their finished floors. You may want to keep the existing colour, change the stain, adjust the sheen, or simply restore the hardwood’s existing appearance.
Flooring Now offers a free in-home quote as part of its hardwood floor refinishing service. During the consultation, the existing floors can be evaluated and the project can be discussed with the homeowner. Flooring Now also provides stain samples directly on the floor, allowing homeowners to see how different colours look in their actual space before making a final decision. Taking care of these decisions before the project begins can help keep the actual refinishing process organized and prevent unnecessary delays.
Day 1: Preparing the Home and Starting the Sanding
The first day is usually focused on getting the work area ready and beginning the sanding process. Furniture and other items need to be moved so the contractor has access to the entire floor. Once the area is prepared, the existing finish can be removed and the hardwood surface can be properly prepared for the next stages.The amount of sanding required depends on the condition of the floor. A hardwood floor with years of wear, scratches, multiple layers of old finish, or other imperfections may require more preparation than a floor that is simply looking dull. This is one of the biggest reasons why two projects of similar size can have different timelines.
Sanding also creates dust and noise, so homeowners should expect some disruption during this stage. Flooring Now uses vacuum-assisted sanding equipment and containment measures to help minimize the amount of dust that spreads throughout the home, although dust-controlled sanding should not be interpreted as completely dust-free.
Day 2: Completing the Sanding and Staining
Depending on the size and condition of the flooring, sanding may continue into the second day. Once the floor has been properly prepared, the project can move into staining if the homeowner has decided to change the colour. Staining can make a significant difference in the appearance of an older hardwood floor. However, the final colour can vary depending on the species of wood, lighting, and existing characteristics of the flooring. That’s why it’s helpful to look at stain samples in the actual room rather than choosing a colour based only on a small sample.
Not every project requires staining. If you’re happy with the existing colour, the floor can be prepared for the finishing stage without introducing a new stain colour. Your contractor can explain which approach is appropriate based on the condition and appearance of your hardwood.
Day 3: Applying the Protective Finish
After the sanding and staining stages are complete, the floor can receive its protective finish. This is an important part of the process because the finish not only contributes to the final appearance but also helps protect the hardwood from everyday wear. Flooring Now offers both water-based and oil-based finishing products, including products from Loba and DuraSeal. Homeowners can also choose from different levels of sheen depending on the look they want. A satin finish, for example, can provide a more natural appearance without the highly reflective look of a high-gloss floor.
The finishing stage requires patience because the product needs appropriate time to dry between applications. The exact schedule can vary depending on the products being used and the conditions inside the home, so your flooring contractor’s instructions should always take priority over a general timeline.
Day 4: Final Details, Cleanup and Walkthrough
By the final day, the main refinishing work is approaching completion. Depending on the project, this may include completing the final finish, allowing the floor to dry, cleaning the work area, and inspecting the finished flooring. Flooring Now includes cleanup and a final walkthrough as part of its refinishing process. This gives homeowners an opportunity to see the finished result and make sure the project has been completed as expected.
Keep in mind that the end of the work does not necessarily mean the floor is immediately ready for everything to go back to normal. Newly finished hardwood may still need additional drying or curing time before furniture, rugs, pets, and regular household activity can return. Your contractor should provide specific instructions for when the floor can safely be used.
Day 4: Final Details, Cleanup and Walkthrough
By the final day, the main refinishing work is approaching completion. Depending on the project, this may include completing the final finish, allowing the floor to dry, cleaning the work area, and inspecting the finished flooring. Flooring Now includes cleanup and a final walkthrough as part of its refinishing process. This gives homeowners an opportunity to see the finished result and make sure the project has been completed as expected.
Keep in mind that the end of the work does not necessarily mean the floor is immediately ready for everything to go back to normal. Newly finished hardwood may still need additional drying or curing time before furniture, rugs, pets, and regular household activity can return. Your contractor should provide specific instructions for when the floor can safely be used.
When Can You Put Your Furniture Back?
Furniture should be removed from the work area before refinishing begins so the entire floor can be accessed. Flooring Now states that it can assist with furniture moving and offers temporary on-site storage solutions for homeowners who need them. After the project is finished, however, furniture should not automatically be returned immediately. The finish needs time to properly dry and cure, and heavy furniture can potentially affect a newly finished surface if it is placed back too soon. Before moving everything back, make sure you know exactly when the contractor recommends doing so. It’s also a good idea to ask whether heavy furniture requires any special precautions when it is returned to the room.
What Can Make Hardwood Floor Refinishing Take Longer?
The 3–4 day estimate works well as a general guideline, but several factors can change the timeline. The most obvious is the size of the project. Refinishing several rooms or a large portion of an entire home naturally requires more work than refinishing a smaller area.
The condition of the existing hardwood is equally important. Floors with deep scratches, heavy wear, damaged boards, difficult finishes, or additional preparation requirements may take longer to restore. Changing the stain colour can also introduce additional steps, while drying and curing requirements can affect when the floor is ready for normal use.
Some of the main factors that can affect your timeline include:
- Size and square footage of the project
- Condition of the existing hardwood
- Amount of sanding required
- Repairs or additional preparation
- Whether you’re changing the stain colour
- Type of finish being applied
- Drying and curing requirements
- Layout and accessibility of the rooms
This is why an in-home assessment is more useful than relying on a generic timeline alone. Once the contractor can see the actual condition of your floors, they can give you a more realistic expectation for your particular project.
Can You Stay Home While Your Floors Are Being Refinished?
Whether you can stay home depends on the size of the project and how your house is laid out. If only a few rooms are being refinished and you still have access to other areas, staying home may be possible. However, you should expect some noise, equipment, restricted access, and disruption while the work is taking place. If you’re refinishing most of your main living areas, temporarily staying somewhere else may be more comfortable. Before the project starts, ask your contractor which rooms will be unavailable and when you can expect them to become accessible again.This is especially important if you have children, pets, work from home, or other daily responsibilities that depend on access to certain rooms.
How Should You Plan Around Your Refinishing Project?
If you’re planning to refinish your floors before moving into a home, hosting an event, or completing another renovation, give yourself some flexibility. While 3–4 days is a useful estimate, you don’t want to schedule an important event immediately after the expected completion date and leave no room for unexpected preparation or additional drying time.
Before the project begins, make sure you understand:
- When the work will start
- Which rooms will be affected
- What furniture needs to be moved
- Whether staining is included
- What finish will be applied
- When you can walk on the floor
- When furniture can be returned
- When the rooms can return to normal use
Having these details ahead of time can make the project much easier to plan and reduce surprises along the way.
A Simple 3–4 Day Timeline
While every project is different, here’s a simple way to think about a typical hardwood refinishing project in Ottawa:
Before the project: The floor is inspected, the project is discussed, and stain and finish choices are made.
Day 1: The work area is prepared and sanding begins.
Day 2: Sanding is completed as needed, followed by staining if a colour change is part of the project.
Day 3: The protective finish is applied and allowed to dry according to the product requirements.
Day 4: Final finishing, drying, cleanup, inspection, and walkthrough are completed.
Again, this is a general timeline. Flooring Now estimates that most of its Ottawa hardwood floor refinishing projects take approximately 3–4 days depending on the size and condition of the flooring.
Frequently Asked Questions
How long does hardwood floor refinishing take in Ottawa?
Most Flooring Now hardwood floor refinishing projects take approximately 3–4 days. The actual timeline can vary depending on the size and condition of the floor, the amount of preparation required, and whether additional work such as staining or repairs is involved.
Can hardwood floors be refinished in one day?
A complete sanding and refinishing project generally requires more than one day because it involves several stages. However, a buff and coat can often be completed in approximately one day when the floor is suitable for that treatment.
How soon can I put furniture back?
You should wait until the finish has had enough time to dry and cure before returning furniture. The exact waiting period depends on the finishing products and the contractor’s recommendations, so always follow the specific instructions provided for your project.
Can I stay home during the refinishing?
You may be able to stay home if the project is limited to certain rooms, but you should expect noise and restricted access while the work is underway. Larger projects may make staying elsewhere more convenient.
What makes hardwood refinishing take longer?
The size and condition of the floor are two of the biggest factors. Repairs, extensive sanding, changing the stain colour, the finishing process, and drying or curing requirements can also affect the overall timeline.
The Bottom Line
For most Ottawa homeowners, 3–4 days is a reasonable timeframe to plan around for hardwood floor refinishing. However, your specific project may take more or less time depending on the size and condition of your flooring and the type of refinishing work required. The important thing is to understand that refinishing is a multi-stage process. Your floors need to be properly prepared, sanded, stained when necessary, finished, and given enough time to dry and cure. Trying to rush those steps simply to finish sooner isn’t necessarily the best way to get the result you’re looking for.
If you’re considering hardwood floor refinishing in Ottawa, an in-home assessment can give you a much better idea of what your project will involve and how long it should take. Flooring Now offers a free in-home quote to evaluate your floors and discuss your refinishing options.
Planning to refinish your hardwood floors? Get your floors assessed first so you can have a clearer idea of the work involved, expected timeline, and best refinishing option for your home.